Construction weeks 37 & 38: electrical rough-ins and drywall

Drywall is getting hung, son!

Drywall is getting hung, son!

Mark is full-time at the house these days, including weekends, and it will likely continue this way until move in. I’m pulling double-duty with the rest of life, so all I can muster today is a point-form update. Words, sentences and all the things are feeling difficult. Please forgive me.

  • Mark finished running the flex ducting throughout the house.
  • Graham and Sebastian continue to install siding. And continue to do an outstanding job of it.
  • Yves, started and finished all the electrical rough-ins. Since he has a stellar reputation with the ESA (Electrical Service Authority), we quickly passed the inspection over email.
  • Prepared for drywalling, with the help of Brian Rosen, Gary and Alex Sharp.
    • Carried 40 sheets of 12’ long drywall boards up stairs and between rooms.
    • Moved and re-installed our construction stairs away from the wall so the drywall could run past.
    • Since the house is going to be so quiet (outside noises disappear with our thick walls), that means we’ll be extra sensitive to any inside noises. To counter this, we've taken a couple additional steps.
      • Installed resilient channels on ceilings. These are metal strips that the drywall gets screwed into. They reduce foot step noise from floors above by reducing the contact surface area between the drywall and wood structure.
      • Added extra Roxul to our ceilings to further buffer any sound between floors.
  • Started hanging drywall! Ceilings throughout the house and the girl’ bedrooms are finished.
  • Added structural blocking for our floating stairs — the top two staircases. Some extra structure was added between existing studs to anchor the metal brackets that will hold the treads.
  • Ordered custom metal for the interior of the house. Including a metal screen, which will support the other end of the stair treads, and our bridge that spans the open space over the dining room. Both will be powder-coated white.
    • The metal screen will span the height of the main space and frame the stair cases. As you wander through the house, it offers glimpses of the void and of our tall vertical window flanking the opposite side. We’ll hang pants off the screen, and transform it into a bit of a greenwall to breathe more life into the main space.
  • Nathan installed 1 of 2 bathtubs. The master bath is going to be a tricky one. The space is tight and looks like we may have been sent an incorrect part.
  • Mark ran another air test to the same result of 0.4 air changes per hour. He was hoping to improve upon our last result having filled some known gaps. But with new gaps made for electrical and plumbing, even though there were properly sealed, they may have balanced each other out. Or it might be the OSB that’s ‘leaky’ — it is a construction grade material after all, so at this level of tightness, maybe it just doesn’t stand up 100%. We’re hopeful that after drywall, our result may improve. However, Mark’s not holding his breath. He warned me that even though, in a typical build, an air-test post-drywall can improve 20–30%, it’s unlikely our will because we’re already dealing with such small numbers, and there’s little room for such impressive movement. Still keeping our fingers crossed.

That’s the gist of it. We’re managing many moving parts at the moment, but it’s finally starting to feel like we’re getting close to the home-stretch. The building inspector won’t be returning until it’s final occupancy time. Mostly finishing from here on out.

One more thing before my head hits the pillow: don’t miss Mark’s virtual tour this upcoming Thursday. We’ll post the video on the blog afterwards, in case you miss it. Oh, and check out the photos below.

Drywall on the ceilings.

Drywall on the ceilings.

First board goes up.

First board goes up.

Flex ducting complete.

Flex ducting complete.

Kids bathtub (concreted added beneath the tub since this photo was taken).

Kids bathtub (concreted added beneath the tub since this photo was taken).

Marvelous Eastern white cedar.

Marvelous Eastern white cedar.

Hardie board too.

Hardie board too.

Window sill details.

Window sill details.

The roof!

The roof!

Quick screen grab I got Mark to take of his Sketch-up model to show the stair screen and the bridge that floats in front. 

Quick screen grab I got Mark to take of his Sketch-up model to show the stair screen and the bridge that floats in front. 

Upcoming Periscope House Tour: June 2 @ 11 am

ottawa-passive-house

For anyone who missed our last tour, and for those geographically challenged, Mark will be live-streaming this upcoming Thursday (June 2) at 11 am EST. You'll have to download the Periscope App to tune-in. Follow @marktrosen. Highly recommend you do so because you can ask him questions and interact as he walks you through the house. 

Weeks 35 & 36: siding, ducts & open house tour

ottawa-passive-house

Our daughter Josie turned two today. It was a reminder that over two years ago, our house-building adventure began. The wheels were set in motion when we found out we were pregnant with #2 and knew we would inevitably outgrow our little house. We purchased the lot across the street from us and so it began. It feels like we’re finally hitting the home stretch. With the house and the trying baby-rearing days. The baby days are over. Sniff. I very much look forward to the many adventures in our new house, however. Move-in day can’t come soon enough, which should only be a couple months off.

Scaffolding up on the north wall.

Scaffolding up on the north wall.

A glimpse at the cedar behind the scaffolding. C'est magnifique!

A glimpse at the cedar behind the scaffolding. C'est magnifique!

One of the most exciting site-visits for me came last week, when I saw some of the cedar siding up on our North wall. It looks fantastic! The strapping went a bit slower than we had hoped because the shell of our house is actually a lot less square than we had hoped/thought it was. Graham and crew from Vessel woods are doing a bang-up job resurrecting the issue. I cannot wait to see the siding across the rest of the house. Should take a few more weeks of work. They will tackle the front façade last, so I’ll have to hold my breath until then. At least I have our amazing blue doors to tide me over. The Hermann’s were back on site last week to install them.

The Sentinel

The Sentinel

Our house ducts

Our house ducts

Mark finished installing the Zehnder flex ducts throughout the house. At the moment, it looks like the sentinel robot from the Matrix has taken up residence in our walls. The install went pretty smoothly. However, in sorting out the layout for our mechanical room, Mark realized he ordered the Heat Exchanger in the wrong orientation. So we’ll have to swap it out before it gets installed.

Mark was also busy taking deliveries, making decisions, juggling a million moving parts and covering for me on the home front while I was away in NYC for work (and play). Busy is the understatement of the century. His brother Brian is in town now to help out. He’s mostly here to help with drywalling, but that’s not set to begin for another week or so. We’ll find plenty to keep him busy with in the meantime. Including hang-time with his two little nieces. Brian watched the girls on Saturday so Mark and I could both be present at the open house tour.

We had a great turnout and lots of great questions. Thank you to all who made it out, it was a really exciting day for us to meet and talk to people interested in this kind of stuff.

A few people have been surprised that we’re opening our house up to tours like this. And I guess it’s not really a normal thing to do. But then again, nothing about our house is ‘normal’. The more I learn about building, the more I believe that we should pay attention to how our houses get built and what goes into our walls. When the drywall goes up, all is hidden. When the siding goes up, all is hidden. How can you tell the difference between our house and another new build going in down the street? You can’t. Unless you look at the drawings or look for a certification like Passive House. What better opportunity to see what’s inside a wall than to see it under construction? So I guess that’s why we’ve been opening our house up the way we have been and will continue to do so.

The next open house tour will likely be when the house is complete. It will be a house like any other at this stage, albeit fantastically comfortable and incredibly beautiful. The house won’t feel like a science experiment, and all the thought, cost and planning that went into our walls happened because it’s simply the way it ought to be.

Btw, if you missed out on the open house tour, but are still interested, post a comment or send us a message. We both realized, in hindsight, that we totally should have Periscoped (web streamed) the tour. If we give another any time soon, we’ll be sure to press record and/or pass along an invite.

 

May 14th - Open House and Tour 10am-3pm

Our new blue doors will be open for all this coming Saturday!

Our new blue doors will be open for all this coming Saturday!

We are planning to have an open door tour day this coming Saturday, May 14th. Our doors will be open from 10am until 3pm, and I'll be giving a walkthrough tour at 12pm.

Please come by and check out our Passive House build! This will be the last chance to tour the house before drywall starts. It's a great opportunity to see into the walls and mechanical systems. There's no need to sign up in advance, please just come by at your convenience.

Looking forward to seeing everyone in a week!

What: Wander House open doors tour day (Passive House infill project)

Who: Mark and Meghan Rosen will be on site all day to answer your questions and show you around. Mark is the Architect, Passive House Designer, Owner (with Meghan), and Builder on this project. Check out plotnonplot.ca and beinc.ca for more information on Mark's architecture and consulting firms.

When: Saturday, May 14th 2016, 10am-3pm (tour at 12pm)

Where: 105 Bayswater Avenue, Ottawa, ON

Construction weeks 33 & 34 – plumbing, hvac and more

manifold system

manifold system

plastic in the walls

plastic in the walls

Wow, it’s been a couple weeks since I’ve provided an update. The house has been relatively quiet with only one or two people working at a time. That has since dramatically changed…

Nathan, from Ackland Plumbing, has finished the first rough-in phase for plumbing. We’ve got spiffy (BPA-free) breathable supply pipes running through the house, and a purple one which supplies the grey water. He was explaining to me how, just 10 years ago, a different kind of plastic pipe was getting installed in Canadian houses, one which does not breathe and where water stagnates and becomes unsafe for drinking. Insurance companies will not insure these houses and lawsuits are being filed against the building code. Lesson learned: what seems like a good idea today, may very well prove to untrue tomorrow. And wet things need to breathe, trapped moisture is the enemy of building. I digress. Back to our house.

Nathan managed to carefully maneuver all supplies and drains in and between our open floor trusses and walls. The design of our house helped to facilitate this, with Mark stacking all the plumbing and electrical to one side of the house, over the mechanical room. (This poses absolutely no risk Myles btw (comment from previous post), it’s actually a really clever thing to do when building because all utility runs are minimized in terms of materials and labour). We’ve received numerous compliments on Nathan’s handiwork and it passed the plumbing inspection no problem-o. He’s as excited as we are to have a neat and tidy mission control in our mechanical room, where we’ll go copper for added ‘wow’ factor. Good stuff.

wood fibreboard clads the house until the siding gets installed overtop

wood fibreboard clads the house until the siding gets installed overtop

the cardboard box phase

the cardboard box phase

Speaking of passing inspections, we also passed our building envelope inspection. Hooray! We were nervous about this one because we weren’t sure how the inspector would feel about forgoing the traditional Tyvek weatherproof house wrap for our wood fibreboard. The wood fibreboard is more common in Europe and is not often seen on our side of the pond. Mark provided specs to the building inspector and explained it to him. We’re fortunate to have an experienced and open-minded official. But there’s no doubt to anyone walking through or around our house that it’s a well-built, thoroughly considered house.

zehnder hrv unboxing
zehnder hrv

And back to the mechanical room. Hans from Pinwheel Builds met with Mark and dropped off our new Zehnder HRV and heat exchanger along with coils of flexible plastic pipes, which are to be our house’s air ducts for circulating what little heat we require. It’s a pretty groovy system. We won’t have any gross floor ducts, bulkheads or metal work in our house. All you’ll see are small 8” diameter circles mounted to the occasional wall and ceiling to circulate air. Mark went over his plan with Hans and has started installing the ducting himself. Unboxing the parts was better than Christmas for Mark. He was so excited.

parapet roof

parapet roof

new carhartts

new carhartts

From here on out, Mark will be spending as much time as possible working on the house himself. He bought himself a spiffy new pair of Carhartt overalls for the task ;) In addition to starting the ducting, he finished the parapet (a fancy word for structural railing) on our flat roof, cleaned up the front and back yards, and hosted another tour. This last one saw around 30 people who joined as guest of Malcolm Isaacs, who runs the local Passive House courses and is a director of the Canadian Passive House Institute.

brown ash cabinets

brown ash cabinets

ash and gloss white

On the backend, we ordered our kitchen. Another hooray! Finally. There were a few back-and-forths during the homestretch, which prolonged the process, but were key for getting the details ironed out. We’re really excited about it. We ended up going with Astro Design Centre and have had a great experience working with Dean Large. He ‘gets’ us, in terms of design, and was able to add real value to our design experience, which we really appreciated. Astro also had the finishes we liked the most, at the best price. For example, a gloss white was the same cost as a matte white (typically gloss costs more). And we don’t want any hardware, we want recessed handles (a no hardware look typically costs more). We went with the Astro house brand in white gloss for all the cabinets except those on the backside of the island. The backside of the island faces the living area. For these cabinets we chose a sand-blasted (i.e. textured) brown ash. Haven’t ordered our countertops yet. That’s next.

Following suit, we made a decision on our wood flooring and placed the order. We’ve decided to go with white ash from the Wood Source. The same white ash that the city of Ottawa has felled throughout the city to thwart the Emerald Ash Borer. It will be sympathetic to the island wood. We also decided to order some extra wood for the sloped ceiling, which spans our open space, over the master bedroom and loft. A slatted wood ceiling will allow for clever lighting hacks. We’ll be able to hide much of the hardware behind the wood so that we only see what we want to see and can get away with using less expensive fixtures at no aesthetic compromise. It will also look incredibly beautiful. It’s a win-win.

As alluded to earlier, the house is buzzing again this week. Siding has begun amongst other exciting things. Do stay tuned and lookout for another Mark Periscope. He broadcast just today. And hope you’ll join the next house tour!

Open House and Tour

image.jpg

We are planning to hold an open house day and give tours of the house on May 14th. Mark your calendars and tell your friends! Details will be posted here soon, so watch this space. It might be the last chance to see into the walls before drywall starts! 

Construction week 32 — plumbing and ventilation runs

First family picnic on our rooftop patio. Shared it with some friendly pigeons who decided our new home was also their new home.

First family picnic on our rooftop patio. Shared it with some friendly pigeons who decided our new home was also their new home.

Hope you enjoyed last week’s videos. I sure did. Gave me a break from writing. Writer, I am not. Here goes again:

It’s been a couple weeks since my last construction update. We sent the Cornelis Grey crew away last week. We’ll be bringing them back in a few weeks, once we have more work for them. In the meantime, our plumber Nathan from Ackland plumbing, has begun his rough-in work. He's installing a manifold system? It's cool, or so I am told. And Mark, as you may have seen via Periscope, has begun our ventilation layout.

We walked through the house with our electrician, Yves from Portage Electric, to get a feel for our electrical plan in real life. Wow. When you’re lucky enough to be in a position to decide where to put a switch, and what turns on what, you realize what great ‘power’ you have. And what a massive effect the electrical details potentially have on the user experience and enjoyment of a space. It would really suck to be searching around for a switch that was un-intuitively placed. Or if an unsightly 6-switch was in the middle of a feature wall. What makes sense on paper does not always translate when you’re physically walking through a space.

It also forced us to consider what sort of ‘smart’ lighting/electrical systems we might want to consider. I love the idea of walking into a space and having the lights automagically turn themselves on. Imagine no wall switches? Or lights that learn our behaviour. Will these technologies date our house vs. a tried-and-true analog wall switch? As a happy, budget-friendly medium, we’re looking into Lutron’s Caséta system

And do we need “cat 5” cable for our internet? If we want to watch Netflix really really fast? I was under the assumption that regular ol’ wifi would suffice for our entire home, but now that the question has been raised, do I want it? Do I need “cat 6” to future-proof? Our neighbours building up the street included some empty PVC pipe behind their walls, for easy wiring access, should they require something they forgot or doesn’t exist yet. I’m going to lean towards less wires = good, whether or not that’s proves to be true. Time will tell.

There are a lot of moving parts that need to come together over the next few weeks, starting with the plumbing, which will carry on for much of this week. Then ventilation followed by electrical. Yves helped us to understand that his job becomes much simpler if he can reuse or follow some of the previous installs. The bigs rocks go in first, then it's easier to fill the gaps with the sand. Or something like that...Once those inside jobs are all finished, we get to cover up those walls with drywall. We’re flying Mark’s brother in from Nelson BC to help us out with the drywalling. He’s a pro, and a Rosen, so it’s bound to be good :) Only 3 weeks away!

We're still placing orders and making decisions on the back-end. We are so frustratingly close to ordering our kitchen. There have been quite a few back-and-forths to nail it down. All of our siding material has been ordered and work is set to begin next week. Really looking forward to that getting under way. 

Mark’s sporadically giving tours of the house to various groups. He loves doing them, even though it’s a time-suck. We’ll be setting up another public tour some time in the next couple weeks, likely on a weekend. You’ll be able to see what’s running through our walls before we cover them up. We will post the time and date later this week.

One last thing: it’s spring! With the warmer weather, it now feels relatively cooler when I walk inside the house. Neat-o. Same principles apply to cool our house as it does to heat it. We enjoyed our first picnic of the season out on our rooftop deck. Fealt great.

A tour of students from Algonquin College studying architectural technology. And a view of our messy post-winter construction front yard.

A tour of students from Algonquin College studying architectural technology. And a view of our messy post-winter construction front yard.

My wee ones staring out the sitting window #milwaukee

My wee ones staring out the sitting window #milwaukee